Solar installation, run like a construction project

Because it is one. Your roof gets assessed before anything is sold, every penetration gets real flashing, and one accountable crew carries your project from itemized quote to utility power-on.

Mid-installation rooftop: one section of panels mounted, rails and flashed mounts ready for the next row
Included in every install

What "done right" actually includes

  • Roof and structural assessment before design — condition, age, framing, load.
  • Custom design from 12 months of your bills — sized to your usage, not a sales quota.
  • Flashed, sealed penetrations at every mount — the detail that decides whether your roof leaks in year three.
  • Permits, engineering, interconnection — all handled by us, start to finish.
  • Clean electrical work — tidy conduit, labeled disconnects, code-compliant everything.
  • Monitoring set up and explained — you'll know what your system should produce and how to check it.

Equipment and workmanship warranties are provided in writing with every quote — no verbal promises.

Reroof + solar in one project

If your roof has less than 10–15 years left, putting panels on it is a mistake — removing and reinstalling them later costs thousands. We're one of the few solar companies that can honestly assess your roof and, when needed, replace it and install solar in a single coordinated job. One crew, one timeline, one warranty conversation.

Equipment tiers, explained straight

Panels, inverters, and racking come in good/better/best tiers. We quote them side by side and tell you in plain English what each buys you — efficiency, warranty length, shade handling — and when the cheaper option is the smart one.

The process

What happens when, start to finish

1

Assessment & usage review

We inspect roof condition and structure, review a year of utility bills, and check shading. Takes about an hour on site.

2

Design & itemized quote

System layout, production estimate, and line-item pricing — equipment, labor, permits, everything. Compare it anywhere; it's yours.

3

Engineering & permits

Structural and electrical plans stamped, permits filed, utility interconnection application submitted. We chase the paperwork so you don't.

4

Installation

Typically 1–3 days on the roof: racking flashed and sealed, panels mounted, inverter and wiring completed to code, site left clean.

5

Inspection & approval

City/county inspection, then utility permission-to-operate. Timelines vary by jurisdiction; we keep you updated at each gate.

6

Power-on & walkthrough

System energized, monitoring app configured, and a walkthrough of what normal production looks like season to season.

How long does this take around Houston?

The roof work is days; the calendar is mostly paperwork gates, and those depend on your address. Sugar Land reviews plans through its online portal against current 2024 codes; Pearland runs a conventional city permit; much of Katy sits in unincorporated county territory with a different path entirely; and The Woodlands adds covenant review before work starts. Then every project waits on CenterPoint's (or TNMP's) permission-to-operate. Realistic total: several weeks from signed quote to power-on, driven by jurisdiction — we tell you your address's actual gates in the first conversation, then chase them daily.

Will the panels handle hurricane season?

This is a structural question, and it's why builder DNA matters. Attachment spacing and racking are engineered to the wind loads your jurisdiction requires, every mount hits framing (not just decking), and every penetration is flashed and sealed — the same details that decide whether a roof itself survives a storm. Panels properly through-bolted to structure routinely ride out hurricane winds; the failures you see in storm photos are almost always attachment shortcuts. We don't take them.

Questions

Installation questions, answered

Should I replace my roof before going solar?

If your roof has less than 10–15 years of life left, usually yes — removing and reinstalling panels later typically costs thousands. We assess your roof honestly (we're builders — reroofing is our native trade) and can handle reroof + solar as one coordinated project.

What size system does my house need?

Size follows your actual usage, roof space, orientation, and shading — not square footage. We design from 12 months of utility bills. Typical U.S. homes land between 6 and 12 kW, but the right answer is whatever your usage and roof support.

What brands do you install?

We design around proven, bankable equipment tiers rather than pushing one brand. Every quote lays out panel, inverter, and racking options with what you gain (and don't) at each price point. All manufacturer warranties in writing.

Do you handle permits and utility paperwork?

All of it — engineering, permits, interconnection, inspections. Permitting is where solar projects stall, and it's the part a construction company is built for.

Start with a roof-first assessment

Free, on-site, no pressure. If your home isn't a good fit for solar, we'll tell you that too — and you'll know why.